Meeting with the architects Les Chalets de l’Orsa
Meeting to finalize the last details and send out the calls for tenders! On the way to starting the work
Meeting with the architects Les Chalets de l’Orsa Read More »
Meeting to finalize the last details and send out the calls for tenders! On the way to starting the work
Meeting with the architects Les Chalets de l’Orsa Read More »
It’s back-to-school time for L&L PROMOTION, we hope you had a wonderful summer Back in Argentière for the construction site meeting of the Royal Straton, where the foundations have been completed
Le Royal Straton development Read More »
Preparation of exterior developments 🏗 A pedestrian access designed for everyone, incorporating ramps and stairs.
Exterior preparation 🗻 Read More »
Survey in progress at the Chalets de l’Orsa in Morillon 🏗 The soil study is used to validate the nature of the ground on which the Les Chalets de l’Orsa development will be built. This is an essential step as it allows for the characterization of the type of foundations for the future construction 🤓
Soil analysis at Les Chalets de l’Orsa Read More »
The soldier-pile walls are now installed and the company RAVANEL is preparing the levelling
Levelling at Le Royal Straton Read More »
Tarmac underway ! The borders are in place, the topsoil has just been placed in the gardens The small chalet called “mazot” which will house the ski lockers is also under construction !
Tarmac preparation at Les Chalets de Bostan Read More »
News from the Cosmiques construction The stone cladding is installed at each entrances
Les Cosmiques in Les Houches Read More »
The trees have been cut on the Royal Straton’s plot in Argentière while the 2 small chalets are being demolished ! Guess the view behind the mist ? The Glacier d’Argentière and the Aiguille Verte
Demolition and trees cutting Read More »
The stairs are being installed in chalets A & B at Les Chalets de Bostan !
Stairs installation Read More »