Exterior preparation 🗻
Preparation of exterior developments 🏗 A pedestrian access designed for everyone, incorporating ramps and stairs.
Exterior preparation 🗻 Read More »
Preparation of exterior developments 🏗 A pedestrian access designed for everyone, incorporating ramps and stairs.
Exterior preparation 🗻 Read More »
Survey in progress at the Chalets de l’Orsa in Morillon 🏗 The soil study is used to validate the nature of the ground on which the Les Chalets de l’Orsa development will be built. This is an essential step as it allows for the characterization of the type of foundations for the future construction 🤓
Soil analysis at Les Chalets de l’Orsa Read More »
The soldier-pile walls are now installed and the company RAVANEL is preparing the levelling
Levelling at Le Royal Straton Read More »
Tarmac underway ! The borders are in place, the topsoil has just been placed in the gardens The small chalet called “mazot” which will house the ski lockers is also under construction !
Tarmac preparation at Les Chalets de Bostan Read More »
News from the Cosmiques construction The stone cladding is installed at each entrances
Les Cosmiques in Les Houches Read More »
The trees have been cut on the Royal Straton’s plot in Argentière while the 2 small chalets are being demolished ! Guess the view behind the mist ? The Glacier d’Argentière and the Aiguille Verte
Demolition and trees cutting Read More »
The stairs are being installed in chalets A & B at Les Chalets de Bostan !
Stairs installation Read More »
Kitchens are almost installed in all the chalet A apartments ! The carpenter has finished his fake wooden ceiling and wooden walls while the bathrooms have received their floor and wall tiles.
What’s new at Les Cosmiques ? Read More »
The Chalets de Bostan joiner is currently installing the wood panelling in the Chalet A flats. All of which adds to the cosy feel of a mountain flat in the magnificent village of Samoëns.
LAMBRIS INSTALLATION at Chalets de Bostan Read More »